C&I Rooftop Project

1.2MW Solar Rooftop System for Automotive Parts Manufacturer

Location: Ho Chi Minh City, Vietnam
Completion Date: March 2024

The Challenge

The client faced volatile electricity prices and frequent peak-hour demand charges, which significantly impacted their production costs. The roof structure was complex, requiring non-penetrating mounting solutions.

Our Solution

We deployed 2,184 pieces of 550W Tier-1 Mono PERC modules with a 1.2MW string inverter system. Our engineering team utilized ballast-mounted racking to protect the roof integrity while maximizing South-facing exposure.

Annual Generation

1.56 GWh

ROI Period

3.8 Years

CO2 Reduction

850 Tons per year

Utility-Scale Ground Mount

20MW Utility-Scale Solar Farm with Tracking System

Location: Andalusia, Spain
Completion Date: November 2023

The Challenge

The project required optimization for uneven terrain and compliance with strict EU grid codes. The client needed a bankable solution to secure project financing.

Our Solution

We provided a full turnkey EPC service, including civil works, single-axis tracker installation, and grid connection approval. Utilizing bifacial modules, we increased ground reflection gain by 12%.

Technology Highlight

Equipped with smart tracking algorithms to minimize shading and optimize energy yield throughout the day.

System Size

20 MWp

Grid Connection

132 kV Substation

Performance Ratio

82.5%

Residential Storage System

High-Voltage Storage System for Residential Energy Independence

Location: California, USA
Completion Date: January 2024

The Challenge

Frequent grid outages due to wildfire risks and high Time-of-Use (TOU) electricity rates. The homeowner wanted a backup solution that could last through the night.

Our Solution

A 10kW hybrid inverter paired with a 20kWh LiFePO4 battery stack. The system features black-start capability and smart load management via a mobile app.

User Experience

Seamless transition during grid failure. The homeowner now enjoys near-zero electricity bills.

Self-Consumption Rate

95%

Backup Duration

24+ Hours

Warranty

10 Years Product & Performance

Off-Grid / Agricultural

Solar Water Pumping System for Arid Region Farming

Location: Rajasthan, India
Completion Date: August 2023

The Challenge

Lack of grid access for irrigation. Diesel generators were costly to run and maintain, causing operational headaches for the farm owner.

Our Solution

A 15HP DC solar pumping system with a 22kW VFD inverter. No batteries required, directly converting solar energy into water flow.

Water Output

120 m³/day

Diesel Saved

10,000 Liters/year

Payback Period

< 2 Years