— C&I Rooftop Project
1.2MW Solar Rooftop System for Automotive Parts Manufacturer
Location: Ho Chi Minh City, Vietnam
Completion Date: March 2024
The Challenge
The client faced volatile electricity prices and frequent peak-hour demand charges, which significantly impacted their production costs. The roof structure was complex, requiring non-penetrating mounting solutions.
Our Solution
We deployed 2,184 pieces of 550W Tier-1 Mono PERC modules with a 1.2MW string inverter system. Our engineering team utilized ballast-mounted racking to protect the roof integrity while maximizing South-facing exposure.
Annual Generation
1.56 GWh
ROI Period
3.8 Years
CO2 Reduction
850 Tons per year
— Utility-Scale Ground Mount
20MW Utility-Scale Solar Farm with Tracking System
Location: Andalusia, Spain
Completion Date: November 2023
The Challenge
The project required optimization for uneven terrain and compliance with strict EU grid codes. The client needed a bankable solution to secure project financing.
Our Solution
We provided a full turnkey EPC service, including civil works, single-axis tracker installation, and grid connection approval. Utilizing bifacial modules, we increased ground reflection gain by 12%.
Technology Highlight
Equipped with smart tracking algorithms to minimize shading and optimize energy yield throughout the day.
System Size
20 MWp
Grid Connection
132 kV Substation
Performance Ratio
82.5%
— Residential Storage System
High-Voltage Storage System for Residential Energy Independence
Location: California, USA
Completion Date: January 2024
The Challenge
Frequent grid outages due to wildfire risks and high Time-of-Use (TOU) electricity rates. The homeowner wanted a backup solution that could last through the night.
Our Solution
A 10kW hybrid inverter paired with a 20kWh LiFePO4 battery stack. The system features black-start capability and smart load management via a mobile app.
User Experience
Seamless transition during grid failure. The homeowner now enjoys near-zero electricity bills.
Self-Consumption Rate
95%
Backup Duration
24+ Hours
Warranty
10 Years Product & Performance
— Off-Grid / Agricultural
Solar Water Pumping System for Arid Region Farming
Location: Rajasthan, India
Completion Date: August 2023
The Challenge
Lack of grid access for irrigation. Diesel generators were costly to run and maintain, causing operational headaches for the farm owner.
Our Solution
A 15HP DC solar pumping system with a 22kW VFD inverter. No batteries required, directly converting solar energy into water flow.
Water Output
120 m³/day
Diesel Saved
10,000 Liters/year
Payback Period
< 2 Years